Growth Metrics

Lifetime Brands (LCUT) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Lifetime Brands (LCUT) over the last 8 years, with Q4 2018 value amounting to $1.0 million.

  • Lifetime Brands' Construction in Progress fell 6694.43% to $1.0 million in Q4 2018 from the same period last year, while for Dec 2018 it was $1.0 million, marking a year-over-year decrease of 6694.43%. This contributed to the annual value of $1.0 million for FY2018, which is 6694.43% down from last year.
  • According to the latest figures from Q4 2018, Lifetime Brands' Construction in Progress is $1.0 million, which was down 6694.43% from $3.1 million recorded in Q4 2017.
  • In the past 5 years, Lifetime Brands' Construction in Progress ranged from a high of $3.1 million in Q4 2017 and a low of $1.0 million during Q4 2018
  • Its 5-year average for Construction in Progress is $1.9 million, with a median of $1.5 million in 2015.
  • In the last 5 years, Lifetime Brands' Construction in Progress soared by 96538.46% in 2014 and then crashed by 6694.43% in 2018.
  • Quarter analysis of 5 years shows Lifetime Brands' Construction in Progress stood at $1.1 million in 2014, then skyrocketed by 39.26% to $1.5 million in 2015, then surged by 71.03% to $2.6 million in 2016, then increased by 18.3% to $3.1 million in 2017, then crashed by 66.94% to $1.0 million in 2018.
  • Its Construction in Progress was $1.0 million in Q4 2018, compared to $3.1 million in Q4 2017 and $2.6 million in Q4 2016.