Liberty Energy (LBRT) Construction in Progress (2017 - 2024)
Liberty Energy has reported Construction in Progress over the past 8 years, most recently at $216.2 million for Q2 2024.
- For Q2 2024, Construction in Progress rose 19.24% year-over-year to $216.2 million; the TTM value through Jun 2024 reached $216.2 million, up 19.24%, while the annual FY2023 figure was $156.6 million, 1.21% down from the prior year.
- Construction in Progress for Q2 2024 was $216.2 million at Liberty Energy, up from $184.0 million in the prior quarter.
- Over five years, Construction in Progress peaked at $216.2 million in Q2 2024 and troughed at $20.4 million in Q3 2020.
- A 5-year average of $133.2 million and a median of $150.7 million in 2022 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: skyrocketed 757.13% in 2020 and later crashed 41.71% in 2021.
- Year by year, Construction in Progress stood at $153.7 million in 2020, then tumbled by 41.71% to $89.6 million in 2021, then skyrocketed by 76.92% to $158.5 million in 2022, then fell by 1.21% to $156.6 million in 2023, then surged by 38.07% to $216.2 million in 2024.
- Business Quant data shows Construction in Progress for LBRT at $216.2 million in Q2 2024, $184.0 million in Q1 2024, and $156.6 million in Q4 2023.