Growth Metrics

Eastman Kodak (KODK) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Eastman Kodak (KODK) over the last 14 years, with Q4 2024 value amounting to $55.0 million.

  • Eastman Kodak's Construction in Progress rose 10370.37% to $55.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $55.0 million, marking a year-over-year increase of 10370.37%. This contributed to the annual value of $55.0 million for FY2024, which is 10370.37% up from last year.
  • Latest data reveals that Eastman Kodak reported Construction in Progress of $55.0 million as of Q4 2024, which was up 10370.37% from $27.0 million recorded in Q4 2023.
  • Eastman Kodak's 5-year Construction in Progress high stood at $55.0 million for Q4 2024, and its period low was $8.0 million during Q4 2020.
  • For the 5-year period, Eastman Kodak's Construction in Progress averaged around $26.8 million, with its median value being $27.0 million (2023).
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 2727.27% in 2020, then soared by 10370.37% in 2024.
  • Quarter analysis of 5 years shows Eastman Kodak's Construction in Progress stood at $8.0 million in 2020, then surged by 87.5% to $15.0 million in 2021, then surged by 93.33% to $29.0 million in 2022, then dropped by 6.9% to $27.0 million in 2023, then surged by 103.7% to $55.0 million in 2024.
  • Its last three reported values are $55.0 million in Q4 2024, $27.0 million for Q4 2023, and $29.0 million during Q4 2022.