Cash Flow Statement
Growth Metrics

Eastman Kodak (KODK) Construction in Progress (2016 - 2025)

Eastman Kodak's Construction in Progress history spans 15 years, with the latest figure at $15.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 72.73% year-over-year to $15.0 million; the TTM value through Dec 2025 reached $15.0 million, down 72.73%, while the annual FY2025 figure was $15.0 million, 72.73% down from the prior year.
  • Construction in Progress reached $15.0 million in Q4 2025 per KODK's latest filing, down from $55.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $55.0 million in Q4 2024 to a low of $15.0 million in Q4 2021.
  • Average Construction in Progress over 5 years is $28.2 million, with a median of $27.0 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: soared 103.7% in 2024, then plummeted 72.73% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $15.0 million in 2021, then surged by 93.33% to $29.0 million in 2022, then dropped by 6.9% to $27.0 million in 2023, then soared by 103.7% to $55.0 million in 2024, then tumbled by 72.73% to $15.0 million in 2025.
  • Per Business Quant, the three most recent readings for KODK's Construction in Progress are $15.0 million (Q4 2025), $55.0 million (Q4 2024), and $27.0 million (Q4 2023).