Nauticus Robotics (KITT) Construction in Progress (2021 - 2023)
Nauticus Robotics (KITT) has disclosed Construction in Progress for 3 consecutive years, with $24.2 million as the latest value for Q3 2023.
- For Q3 2023, Construction in Progress rose 219.73% year-over-year to $24.2 million; the TTM value through Sep 2023 reached $24.2 million, up 219.73%, while the annual FY2022 figure was $13.0 million, 8536.91% up from the prior year.
- Construction in Progress was $24.2 million for Q3 2023 at Nauticus Robotics, up from $19.8 million in the prior quarter.
- The five-year high for Construction in Progress was $24.2 million in Q3 2023, with the low at $150220.0 in Q4 2021.
- Historically, Construction in Progress has averaged $13.3 million across 3 years, with a median of $14.0 million in 2022.
- The largest annual shift saw Construction in Progress surged 8536.91% in 2022 before it surged 219.73% in 2023.
- Over 3 years, Construction in Progress stood at $150220.0 in 2021, then surged by 8536.91% to $13.0 million in 2022, then skyrocketed by 86.53% to $24.2 million in 2023.
- Per Business Quant database, its latest 3 readings for Construction in Progress were $24.2 million in Q3 2023, $19.8 million in Q2 2023, and $15.0 million in Q1 2023.