Growth Metrics

Keurig Dr Pepper (KDP) Buildings (2016 - 2025)

Keurig Dr Pepper has reported Buildings over the past 17 years, most recently at $912.0 million for Q4 2025.

  • Quarterly Buildings rose 10.55% to $912.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $912.0 million through Dec 2025, up 10.55% year-over-year, with the annual reading at $912.0 million for FY2025, 10.55% up from the prior year.
  • Buildings was $912.0 million for Q4 2025 at Keurig Dr Pepper, up from $825.0 million in the prior quarter.
  • Over five years, Buildings peaked at $912.0 million in Q4 2025 and troughed at $720.0 million in Q4 2022.
  • The 5-year median for Buildings is $793.0 million (2021), against an average of $798.8 million.
  • Biggest five-year swings in Buildings: surged 52.5% in 2021 and later decreased 9.21% in 2022.
  • Tracing KDP's Buildings over 5 years: stood at $793.0 million in 2021, then dropped by 9.21% to $720.0 million in 2022, then rose by 3.33% to $744.0 million in 2023, then grew by 10.89% to $825.0 million in 2024, then increased by 10.55% to $912.0 million in 2025.
  • According to Business Quant data, Buildings over the past three periods came in at $912.0 million, $825.0 million, and $744.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.