JinkoSolar Holding (JKS) Construction in Progress (2016 - 2024)
JinkoSolar Holding (JKS) has disclosed Construction in Progress for 13 consecutive years, with $411.3 million as the latest value for Q4 2024.
- Quarterly Construction in Progress fell 23.88% to $411.3 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $411.3 million through Dec 2024, down 23.88% year-over-year, with the annual reading at $411.3 million for FY2024, 23.88% down from the prior year.
- Construction in Progress hit $411.3 million in Q4 2024 for JinkoSolar Holding, down from $540.3 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $540.3 million in Q4 2023 to a low of $106.8 million in Q4 2020.
- Historically, Construction in Progress has averaged $338.1 million across 5 years, with a median of $411.3 million in 2024.
- Biggest five-year swings in Construction in Progress: soared 287.52% in 2021 and later crashed 47.33% in 2022.
- Year by year, Construction in Progress stood at $106.8 million in 2020, then soared by 287.52% to $414.0 million in 2021, then tumbled by 47.33% to $218.1 million in 2022, then surged by 147.75% to $540.3 million in 2023, then fell by 23.88% to $411.3 million in 2024.
- Business Quant data shows Construction in Progress for JKS at $411.3 million in Q4 2024, $540.3 million in Q4 2023, and $218.1 million in Q4 2022.