Jack In The Box (JACK) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Jack In The Box (JACK) over the last 17 years, with Q3 2025 value amounting to $39.4 million.
- Jack In The Box's Construction in Progress fell 2022.65% to $39.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $39.4 million, marking a year-over-year decrease of 2022.65%. This contributed to the annual value of $39.4 million for FY2025, which is 2022.65% down from last year.
- As of Q3 2025, Jack In The Box's Construction in Progress stood at $39.4 million, which was down 2022.65% from $49.4 million recorded in Q3 2024.
- In the past 5 years, Jack In The Box's Construction in Progress registered a high of $49.4 million during Q3 2024, and its lowest value of $6.9 million during Q4 2021.
- In the last 5 years, Jack In The Box's Construction in Progress had a median value of $31.6 million in 2023 and averaged $29.1 million.
- Per our database at Business Quant, Jack In The Box's Construction in Progress skyrocketed by 16502.76% in 2022 and then tumbled by 2022.65% in 2025.
- Over the past 5 years, Jack In The Box's Construction in Progress (Quarter) stood at $6.9 million in 2021, then surged by 165.03% to $18.3 million in 2022, then skyrocketed by 73.21% to $31.6 million in 2023, then skyrocketed by 56.24% to $49.4 million in 2024, then fell by 20.23% to $39.4 million in 2025.
- Its last three reported values are $39.4 million in Q3 2025, $49.4 million for Q3 2024, and $31.6 million during Q4 2023.