KPIs & Operating Metrics(New)
Growth Metrics

Jack In The Box (JACK) Construction in Progress (2016 - 2025)

Jack In The Box has reported Construction in Progress over the past 17 years, most recently at $39.4 million for Q3 2025.

  • Quarterly results put Construction in Progress at $39.4 million for Q3 2025, down 20.23% from a year ago — trailing twelve months through Sep 2025 was $39.4 million (down 20.23% YoY), and the annual figure for FY2025 was $39.4 million, down 20.23%.
  • Construction in Progress for Q3 2025 was $39.4 million at Jack In The Box, down from $49.4 million in the prior quarter.
  • Over the last five years, Construction in Progress for JACK hit a ceiling of $49.4 million in Q3 2024 and a floor of $6.9 million in Q4 2021.
  • Median Construction in Progress over the past 5 years was $31.6 million (2023), compared with a mean of $29.1 million.
  • Biggest five-year swings in Construction in Progress: surged 165.03% in 2022 and later dropped 20.23% in 2025.
  • Jack In The Box's Construction in Progress stood at $6.9 million in 2021, then soared by 165.03% to $18.3 million in 2022, then skyrocketed by 73.21% to $31.6 million in 2023, then soared by 56.24% to $49.4 million in 2024, then dropped by 20.23% to $39.4 million in 2025.
  • The last three reported values for Construction in Progress were $39.4 million (Q3 2025), $49.4 million (Q3 2024), and $31.6 million (Q4 2023) per Business Quant data.