Ituran Location & Control (ITRN) Work In Process (2011)

Ituran Location & Control (ITRN) reported Work In Process of $96000.0 for Q4 2011.

Ituran Location & Control (ITRN) Work In Process (2011) Analysis & Trends

Ituran Location & Control has reported Work In Process for 1 years, with the latest figure at $96000.0 in Q4 2011.

  • For the quarter ending Q4 2011, Work In Process changed N/A year-over-year to $96000.0; the trailing twelve-month figure through Dec 2011 stood at $96000.0 (changed N/A YoY), and the FY2011 full-year result was $96000.0, changed N/A from the prior year.
  • Work In Process for Q4 2011 stood at $96000.0.
  • The five-year high for Work In Process was $96000.0 in Q4 2011, with the low at $96000.0 in Q4 2011.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr)
1 Coherent 67.67 Bn 66.37 Bn 679.95 Mn
2 Keysight Technologies 57.00 Bn 54.83 Bn 995.00 Mn
3 Garmin 45.82 Bn 43.12 Bn 1.04 Bn
4 Teledyne Technologies 28.64 Bn 28.34 Bn 673.80 Mn
5 Mks 21.67 Bn 21.10 Bn 507.00 Mn
6 Fortive 19.42 Bn 19.07 Bn 675.50 Mn
7 Trimble 12.42 Bn 12.19 Bn 646.30 Mn
8 Cognex 10.23 Bn 9.94 Bn 190.94 Mn
9 Esco Technologies 7.86 Bn 7.77 Bn 131.32 Mn
10 Ituran Location & Control 1.27 Bn 1.17 Bn 47.21 Mn

Historic Data

Download Data
DateValue
Dec 31, 2011 96,000.00