Growth Metrics

International Land Alliance (ILAL) Construction in Progress (2019 - 2022)

International Land Alliance has reported Construction in Progress over the past 4 years, most recently at $1.3 million for Q3 2022.

  • For Q3 2022, Construction in Progress rose 124.07% year-over-year to $1.3 million; the TTM value through Sep 2022 reached $1.3 million, up 124.07%, while the annual FY2021 figure was $852020.0, 141.37% up from the prior year.
  • Construction in Progress for Q3 2022 was $1.3 million at International Land Alliance, up from $1.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.3 million in Q3 2022 and troughed at $250000.0 in Q4 2019.
  • A 4-year average of $600574.2 and a median of $498647.0 in 2021 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: soared 41.2% in 2020 and later surged 141.37% in 2021.
  • Year by year, Construction in Progress stood at $250000.0 in 2019, then soared by 41.2% to $353000.0 in 2020, then surged by 141.37% to $852020.0 in 2021, then skyrocketed by 52.17% to $1.3 million in 2022.
  • Business Quant data shows Construction in Progress for ILAL at $1.3 million in Q3 2022, $1.2 million in Q2 2022, and $961020.0 in Q1 2022.