Growth Metrics

IES Holdings (IESC) Construction in Progress: 2013-2025

Historic Construction in Progress for IES Holdings (IESC) over the last 13 years, with Sep 2025 value amounting to $12.1 million.

  • IES Holdings' Construction in Progress rose 84.17% to $12.1 million in Q3 2025 from the same period last year, while for Sep 2025 it was $12.1 million, marking a year-over-year increase of 84.17%. This contributed to the annual value of $12.1 million for FY2025, which is 84.17% up from last year.
  • IES Holdings' Construction in Progress amounted to $12.1 million in FY2025, which was up 84.17% from $6.6 million recorded in FY2024.
  • Over the past 5 years, IES Holdings' Construction in Progress peaked at $12.1 million during FY2025, and registered a low of $539,000 during FY2022.
  • Moreover, its 3-year median value for Construction in Progress was $6.6 million (2024), whereas its average is $6.7 million.
  • As far as peak fluctuations go, IES Holdings' Construction in Progress crashed by 58.92% in 2022, and later surged by 381.20% in 2024.
  • Yearly analysis of 5 years shows IES Holdings' Construction in Progress stood at $1.3 million in 2021, then plummeted by 58.92% to $539,000 in 2022, then surged by 153.62% to $1.4 million in 2023, then surged by 381.20% to $6.6 million in 2024, then skyrocketed by 84.17% to $12.1 million in 2025.