Heartland Express (HTLD) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Heartland Express (HTLD) over the last 13 years, with Q3 2025 value amounting to $28.4 million.
- Heartland Express' Construction in Progress rose 128313.02% to $28.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $28.4 million, marking a year-over-year increase of 128313.02%. This contributed to the annual value of $9.2 million for FY2024, which is 25584.82% up from last year.
- As of Q3 2025, Heartland Express' Construction in Progress stood at $28.4 million, which was up 128313.02% from $22.2 million recorded in Q2 2025.
- Over the past 5 years, Heartland Express' Construction in Progress peaked at $28.4 million during Q3 2025, and registered a low of $1.4 million during Q2 2024.
- For the 5-year period, Heartland Express' Construction in Progress averaged around $11.1 million, with its median value being $9.9 million (2022).
- Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 8889.75% in 2024, then skyrocketed by 144797.77% in 2025.
- Over the past 5 years, Heartland Express' Construction in Progress (Quarter) stood at $3.8 million in 2021, then surged by 293.06% to $15.1 million in 2022, then tumbled by 82.87% to $2.6 million in 2023, then surged by 255.85% to $9.2 million in 2024, then skyrocketed by 208.75% to $28.4 million in 2025.
- Its last three reported values are $28.4 million in Q3 2025, $22.2 million for Q2 2025, and $16.3 million during Q1 2025.