High Tide (HITI) Construction in Progress (2022 - 2025)
Historic Construction in Progress for High Tide (HITI) over the last 4 years, with Q4 2025 value amounting to $911668.5.
- High Tide's Construction in Progress rose 383.3% to $911668.5 in Q4 2025 from the same period last year, while for Oct 2025 it was $911668.5, marking a year-over-year increase of 383.3%. This contributed to the annual value of $903722.5 for FY2025, which is 255.82% up from last year.
- As of Q4 2025, High Tide's Construction in Progress stood at $911668.5, which was up 383.3% from $878014.2 recorded in Q4 2024.
- In the past 5 years, High Tide's Construction in Progress registered a high of $911668.5 during Q4 2025, and its lowest value of $134015.4 during Q4 2022.
- In the last 4 years, High Tide's Construction in Progress had a median value of $701186.2 in 2023 and averaged $612014.1.
- As far as peak fluctuations go, High Tide's Construction in Progress surged by 29126.71% in 2023, and later surged by 383.3% in 2025.
- Over the past 4 years, High Tide's Construction in Progress (Quarter) stood at $134015.4 in 2022, then skyrocketed by 291.27% to $524358.1 in 2023, then skyrocketed by 67.45% to $878014.2 in 2024, then grew by 3.83% to $911668.5 in 2025.
- Its Construction in Progress was $911668.5 in Q4 2025, compared to $878014.2 in Q4 2024 and $524358.1 in Q4 2023.