Growth Metrics

Heico (HEI) Construction in Progress (2016 - 2026)

Heico (HEI) has disclosed Construction in Progress for 14 consecutive years, with $26.0 million as the latest value for Q1 2026.

  • Quarterly Construction in Progress fell 28.42% to $26.0 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $26.0 million through Jan 2026, down 28.42% year-over-year, with the annual reading at $21.8 million for FY2025, 38.44% down from the prior year.
  • Construction in Progress for Q1 2026 was $26.0 million at Heico, up from $21.8 million in the prior quarter.
  • The five-year high for Construction in Progress was $40.9 million in Q2 2025, with the low at $12.0 million in Q1 2022.
  • Average Construction in Progress over 5 years is $24.8 million, with a median of $23.8 million recorded in 2023.
  • The sharpest move saw Construction in Progress soared 86.7% in 2022, then plummeted 40.41% in 2025.
  • Over 5 years, Construction in Progress stood at $14.5 million in 2022, then soared by 77.99% to $25.9 million in 2023, then soared by 36.98% to $35.4 million in 2024, then plummeted by 38.44% to $21.8 million in 2025, then increased by 19.08% to $26.0 million in 2026.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $26.0 million, $21.8 million, and $19.5 million for Q1 2026, Q4 2025, and Q3 2025 respectively.