Heico (HEI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Heico (HEI) over the last 13 years, with Q4 2025 value amounting to $21.8 million.
- Heico's Construction in Progress fell 3843.98% to $21.8 million in Q4 2025 from the same period last year, while for Oct 2025 it was $21.8 million, marking a year-over-year decrease of 3843.98%. This contributed to the annual value of $21.8 million for FY2025, which is 3843.98% down from last year.
- As of Q4 2025, Heico's Construction in Progress stood at $21.8 million, which was down 3843.98% from $19.5 million recorded in Q3 2025.
- In the past 5 years, Heico's Construction in Progress ranged from a high of $40.9 million in Q2 2025 and a low of $7.8 million during Q4 2021
- Its 5-year average for Construction in Progress is $21.5 million, with a median of $21.9 million in 2023.
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 8670.35% in 2022, then plummeted by 4041.37% in 2025.
- Heico's Construction in Progress (Quarter) stood at $7.8 million in 2021, then soared by 86.7% to $14.5 million in 2022, then soared by 77.99% to $25.9 million in 2023, then soared by 36.98% to $35.4 million in 2024, then tumbled by 38.44% to $21.8 million in 2025.
- Its last three reported values are $21.8 million in Q4 2025, $19.5 million for Q3 2025, and $40.9 million during Q2 2025.