Heico (HEI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Heico (HEI) over the last 13 years, with Q4 2025 value amounting to $21.8 million.
- Heico's Construction in Progress fell 3843.98% to $21.8 million in Q4 2025 from the same period last year, while for Oct 2025 it was $21.8 million, marking a year-over-year decrease of 3843.98%. This contributed to the annual value of $21.8 million for FY2025, which is 3843.98% down from last year.
- Per Heico's latest filing, its Construction in Progress stood at $21.8 million for Q4 2025, which was down 3843.98% from $19.5 million recorded in Q3 2025.
- In the past 5 years, Heico's Construction in Progress ranged from a high of $40.9 million in Q2 2025 and a low of $7.8 million during Q4 2021
- For the 5-year period, Heico's Construction in Progress averaged around $21.5 million, with its median value being $21.9 million (2023).
- As far as peak fluctuations go, Heico's Construction in Progress skyrocketed by 8670.35% in 2022, and later tumbled by 4041.37% in 2025.
- Over the past 5 years, Heico's Construction in Progress (Quarter) stood at $7.8 million in 2021, then skyrocketed by 86.7% to $14.5 million in 2022, then skyrocketed by 77.99% to $25.9 million in 2023, then skyrocketed by 36.98% to $35.4 million in 2024, then crashed by 38.44% to $21.8 million in 2025.
- Its Construction in Progress stands at $21.8 million for Q4 2025, versus $19.5 million for Q3 2025 and $40.9 million for Q2 2025.