Growth Metrics

Golar Lng (GLNG) Construction in Progress: 2011-2024

Historic Construction in Progress for Golar Lng (GLNG) over the last 13 years, with Dec 2024 value amounting to $2.3 billion.

  • Golar Lng's Construction in Progress rose 726.41% to $1.1 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $1.1 billion, marking a year-over-year increase of 726.41%. This contributed to the annual value of $2.3 billion for FY2024, which is 44.69% up from last year.
  • Per Golar Lng's latest filing, its Construction in Progress stood at $2.3 billion for FY2024, which was up 44.69% from $1.6 billion recorded in FY2023.
  • In the past 5 years, Golar Lng's Construction in Progress ranged from a high of $2.3 billion in FY2024 and a low of $658.2 million during FY2020.
  • Its 3-year average for Construction in Progress is $1.7 billion, with a median of $1.6 billion in 2023.
  • In the last 5 years, Golar Lng's Construction in Progress surged by 51.58% in 2020 and then tumbled by 31.24% in 2022.
  • Golar Lng's Construction in Progress (MRY) stood at $658.2 million in 2020, then soared by 33.36% to $877.8 million in 2021, then surged by 31.24% to $1.2 billion in 2022, then surged by 35.66% to $1.6 billion in 2023, then soared by 44.69% to $2.3 billion in 2024.
  • Its Construction in Progress stands at $2.3 billion for FY2024, versus $1.6 billion for FY2023 and $1.2 billion for FY2022.