Golar Lng (GLNG) Construction in Progress: 2011-2025
Historic Construction in Progress for Golar Lng (GLNG) over the last 15 years, with Sep 2025 value amounting to $1.1 billion.
- Golar Lng's Construction in Progress rose 726.41% to $1.1 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $1.1 billion, marking a year-over-year increase of 726.41%. This contributed to the annual value of $2.3 billion for FY2024, which is 44.69% up from last year.
- Per Golar Lng's latest filing, its Construction in Progress stood at $1.1 billion for Q3 2025, which was up 348.82% from -$425.0 million recorded in Q2 2025.
- Over the past 5 years, Golar Lng's Construction in Progress peaked at $2.3 billion during Q4 2024, and registered a low of -$425.0 million during Q2 2025.
- In the last 3 years, Golar Lng's Construction in Progress had a median value of -$89.0 million in 2024 and averaged $441.9 million.
- As far as peak fluctuations go, Golar Lng's Construction in Progress skyrocketed by 1,595.87% in 2023, and later crashed by 377.67% in 2025.
- MRQ analysis of 5 years shows Golar Lng's Construction in Progress stood at $877.8 million in 2021, then skyrocketed by 31.24% to $1.2 billion in 2022, then skyrocketed by 35.66% to $1.6 billion in 2023, then soared by 44.69% to $2.3 billion in 2024, then tumbled by 53.24% to $1.1 billion in 2025.
- Its Construction in Progress stands at $1.1 billion for Q3 2025, versus -$425.0 million for Q2 2025 and -$152.6 million for Q1 2025.