Cash Flow Statement
Growth Metrics

Golar Lng (GLNG) Construction in Progress (2019 - 2025)

Golar Lng filings provide 11 years of Construction in Progress readings, the most recent being $1.1 billion for Q3 2025.

  • On a quarterly basis, Construction in Progress fell 47.65% to $1.1 billion in Q3 2025 year-over-year; TTM through Sep 2025 was $1.1 billion, a 47.65% decrease, with the full-year FY2024 number at $2.3 billion, up 44.69% from a year prior.
  • Construction in Progress hit $1.1 billion in Q3 2025 for Golar Lng, up from $874.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $2.5 billion in Q1 2025 to a low of $874.4 million in Q2 2025.
  • Median Construction in Progress over the past 3 years was $1.8 billion (2023), compared with a mean of $1.7 billion.
  • Biggest five-year swings in Construction in Progress: soared 44.69% in 2024 and later crashed 47.65% in 2025.
  • Golar Lng's Construction in Progress stood at $1.6 billion in 2023, then soared by 44.69% to $2.3 billion in 2024, then tumbled by 53.24% to $1.1 billion in 2025.
  • The last three reported values for Construction in Progress were $1.1 billion (Q3 2025), $874.4 million (Q2 2025), and $2.5 billion (Q1 2025) per Business Quant data.