Growth Metrics

Golar Lng (GLNG) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Golar Lng (GLNG) over the last 11 years, with Q3 2025 value amounting to $1.1 billion.

  • Golar Lng's Construction in Progress fell 4764.66% to $1.1 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $1.1 billion, marking a year-over-year decrease of 4764.66%. This contributed to the annual value of $2.3 billion for FY2024, which is 4468.62% up from last year.
  • As of Q3 2025, Golar Lng's Construction in Progress stood at $1.1 billion, which was down 4764.66% from $874.4 million recorded in Q2 2025.
  • In the past 5 years, Golar Lng's Construction in Progress ranged from a high of $2.5 billion in Q1 2025 and a low of $874.4 million during Q2 2025
  • In the last 3 years, Golar Lng's Construction in Progress had a median value of $1.8 billion in 2023 and averaged $1.7 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 4468.62% in 2024, then tumbled by 4764.66% in 2025.
  • Golar Lng's Construction in Progress (Quarter) stood at $1.6 billion in 2023, then skyrocketed by 44.69% to $2.3 billion in 2024, then crashed by 53.24% to $1.1 billion in 2025.
  • Its Construction in Progress was $1.1 billion in Q3 2025, compared to $874.4 million in Q2 2025 and $2.5 billion in Q1 2025.