Growth Metrics

Gevo (GEVO) Construction in Progress (2021 - 2022)

Gevo (GEVO) has disclosed Construction in Progress for 6 consecutive years, with -$900000.0 as the latest value for Q3 2022.

  • On a quarterly basis, Construction in Progress fell 12.5% to -$900000.0 in Q3 2022 year-over-year; TTM through Sep 2022 was -$900000.0, a 12.5% decrease, with the full-year FY2021 number at -$800000.0, changed N/A from a year prior.
  • Construction in Progress was -$900000.0 for Q3 2022 at Gevo, down from -$700000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of -$700000.0 in Q1 2022 to a low of -$900000.0 in Q3 2022.