Growth Metrics

Gevo (GEVO) Construction in Progress (2021 - 2022)

Gevo has reported Construction in Progress over the past 6 years, most recently at -$900000.0 for Q3 2022.

  • Quarterly results put Construction in Progress at -$900000.0 for Q3 2022, down 12.5% from a year ago — trailing twelve months through Sep 2022 was -$900000.0 (down 12.5% YoY), and the annual figure for FY2021 was -$800000.0, changed.
  • Construction in Progress for Q3 2022 was -$900000.0 at Gevo, down from -$700000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for GEVO hit a ceiling of -$700000.0 in Q1 2022 and a floor of -$900000.0 in Q3 2022.