Growth Metrics

Aemetis (AMTX) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Aemetis (AMTX) over the last 13 years, with Q3 2025 value amounting to $45.2 million.

  • Aemetis' Construction in Progress fell 1470.99% to $45.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was $45.2 million, marking a year-over-year decrease of 1470.99%. This contributed to the annual value of $46.2 million for FY2024, which is 3676.03% down from last year.
  • Per Aemetis' latest filing, its Construction in Progress stood at $45.2 million for Q3 2025, which was down 1470.99% from $54.7 million recorded in Q2 2025.
  • In the past 5 years, Aemetis' Construction in Progress ranged from a high of $89.0 million in Q4 2022 and a low of $30.0 million during Q1 2021
  • For the 5-year period, Aemetis' Construction in Progress averaged around $55.8 million, with its median value being $52.7 million (2023).
  • As far as peak fluctuations go, Aemetis' Construction in Progress surged by 13813.67% in 2021, and later crashed by 3871.87% in 2025.
  • Over the past 5 years, Aemetis' Construction in Progress (Quarter) stood at $55.9 million in 2021, then skyrocketed by 59.31% to $89.0 million in 2022, then dropped by 17.9% to $73.1 million in 2023, then tumbled by 36.76% to $46.2 million in 2024, then fell by 2.2% to $45.2 million in 2025.
  • Its Construction in Progress was $45.2 million in Q3 2025, compared to $54.7 million in Q2 2025 and $46.9 million in Q1 2025.