Greif (GEF) Construction in Progress (2016 - 2025)
Greif (GEF) has disclosed Construction in Progress for 17 consecutive years, with $160.6 million as the latest value for Q3 2025.
- On a quarterly basis, Construction in Progress fell 30.14% to $160.6 million in Q3 2025 year-over-year; TTM through Jul 2025 was $160.6 million, a 30.14% decrease, with the full-year FY2024 number at $141.8 million, down 29.28% from a year prior.
- Construction in Progress was $160.6 million for Q3 2025 at Greif, down from $179.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $229.9 million in Q3 2024 to a low of $115.7 million in Q2 2021.
- A 5-year average of $165.4 million and a median of $169.0 million in 2025 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 64.66% in 2023, then tumbled 30.14% in 2025.
- Greif's Construction in Progress stood at $137.2 million in 2021, then soared by 33.31% to $182.9 million in 2022, then grew by 9.62% to $200.5 million in 2023, then dropped by 29.28% to $141.8 million in 2024, then grew by 13.26% to $160.6 million in 2025.
- Per Business Quant, the three most recent readings for GEF's Construction in Progress are $160.6 million (Q3 2025), $179.9 million (Q2 2025), and $169.0 million (Q1 2025).