Growth Metrics

Greif (GEF) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Greif (GEF) over the last 17 years, with Q3 2025 value amounting to $160.6 million.

  • Greif's Construction in Progress fell 3014.35% to $160.6 million in Q3 2025 from the same period last year, while for Jul 2025 it was $160.6 million, marking a year-over-year decrease of 3014.35%. This contributed to the annual value of $141.8 million for FY2024, which is 2927.68% down from last year.
  • According to the latest figures from Q3 2025, Greif's Construction in Progress is $160.6 million, which was down 3014.35% from $179.9 million recorded in Q2 2025.
  • Greif's Construction in Progress' 5-year high stood at $229.9 million during Q3 2024, with a 5-year trough of $115.7 million in Q2 2021.
  • For the 5-year period, Greif's Construction in Progress averaged around $165.4 million, with its median value being $169.0 million (2025).
  • As far as peak fluctuations go, Greif's Construction in Progress skyrocketed by 6465.66% in 2023, and later plummeted by 3014.35% in 2025.
  • Greif's Construction in Progress (Quarter) stood at $137.2 million in 2021, then surged by 33.31% to $182.9 million in 2022, then grew by 9.62% to $200.5 million in 2023, then decreased by 29.28% to $141.8 million in 2024, then increased by 13.26% to $160.6 million in 2025.
  • Its Construction in Progress stands at $160.6 million for Q3 2025, versus $179.9 million for Q2 2025 and $169.0 million for Q1 2025.