Growth Metrics

StealthGas (GASS) Construction in Progress (2016 - 2020)

Historic Construction in Progress for StealthGas (GASS) over the last 9 years, with Q4 2020 value amounting to $6.5 million.

  • StealthGas' Construction in Progress rose 11877.98% to $6.5 million in Q4 2020 from the same period last year, while for Dec 2020 it was $6.5 million, marking a year-over-year increase of 11877.98%. This contributed to the annual value of $6.5 million for FY2020, which is 11877.98% up from last year.
  • Per StealthGas' latest filing, its Construction in Progress stood at $6.5 million for Q4 2020, which was up 11877.98% from $3.0 million recorded in Q4 2019.
  • StealthGas' Construction in Progress' 5-year high stood at $61.6 million during Q4 2017, with a 5-year trough of $3.0 million in Q4 2019.
  • Its 4-year average for Construction in Progress is $39.8 million, with a median of $55.8 million in 2016.
  • As far as peak fluctuations go, StealthGas' Construction in Progress skyrocketed by 1038.26% in 2017, and later surged by 11877.98% in 2020.
  • Over the past 4 years, StealthGas' Construction in Progress (Quarter) stood at $55.8 million in 2016, then increased by 10.38% to $61.6 million in 2017, then tumbled by 95.15% to $3.0 million in 2019, then skyrocketed by 118.78% to $6.5 million in 2020.
  • Its Construction in Progress stands at $6.5 million for Q4 2020, versus $3.0 million for Q4 2019 and $61.6 million for Q4 2017.