First Watch Restaurant (FWRG) Construction in Progress (2021 - 2023)
First Watch Restaurant has reported Construction in Progress over the past 3 years, most recently at $17.5 million for Q4 2023.
- For Q4 2023, Construction in Progress rose 66.7% year-over-year to $17.5 million; the TTM value through Dec 2023 reached $17.5 million, up 66.7%, while the annual FY2023 figure was $17.5 million, 66.7% up from the prior year.
- Construction in Progress for Q4 2023 was $17.5 million at First Watch Restaurant, up from $10.5 million in the prior quarter.
- Over five years, Construction in Progress peaked at $17.5 million in Q4 2023 and troughed at $8.6 million in Q4 2021.
- A 3-year average of $12.2 million and a median of $10.5 million in 2022 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: grew 21.31% in 2022 and later soared 66.7% in 2023.
- Year by year, Construction in Progress stood at $8.6 million in 2021, then increased by 21.31% to $10.5 million in 2022, then soared by 66.7% to $17.5 million in 2023.
- Business Quant data shows Construction in Progress for FWRG at $17.5 million in Q4 2023, $10.5 million in Q4 2022, and $8.6 million in Q4 2021.