Growth Metrics

First Watch Restaurant (FWRG) Construction in Progress (2021 - 2023)

First Watch Restaurant has reported Construction in Progress over the past 3 years, most recently at $17.5 million for Q4 2023.

  • Quarterly results put Construction in Progress at $17.5 million for Q4 2023, up 66.7% from a year ago — trailing twelve months through Dec 2023 was $17.5 million (up 66.7% YoY), and the annual figure for FY2023 was $17.5 million, up 66.7%.
  • Construction in Progress for Q4 2023 was $17.5 million at First Watch Restaurant, up from $10.5 million in the prior quarter.
  • Over the last five years, Construction in Progress for FWRG hit a ceiling of $17.5 million in Q4 2023 and a floor of $8.6 million in Q4 2021.
  • Median Construction in Progress over the past 3 years was $10.5 million (2022), compared with a mean of $12.2 million.
  • Biggest five-year swings in Construction in Progress: rose 21.31% in 2022 and later surged 66.7% in 2023.
  • First Watch Restaurant's Construction in Progress stood at $8.6 million in 2021, then grew by 21.31% to $10.5 million in 2022, then surged by 66.7% to $17.5 million in 2023.
  • The last three reported values for Construction in Progress were $17.5 million (Q4 2023), $10.5 million (Q4 2022), and $8.6 million (Q4 2021) per Business Quant data.