First Us Bancshares (FUSB) Construction in Progress (2018 - 2019)

First Us Bancshares' Construction in Progress history spans 2 years, with the latest figure at $50000.0 for Q4 2019.

  • For Q4 2019, Construction in Progress fell 93.55% year-over-year to $50000.0; the TTM value through Dec 2019 reached $50000.0, down 93.55%, while the annual FY2019 figure was $50000.0, 93.55% down from the prior year.
  • Construction in Progress reached $50000.0 in Q4 2019 per FUSB's latest filing, down from $775000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $775000.0 in Q4 2018 to a low of $50000.0 in Q4 2019.