Growth Metrics

Fluor (FLR) Construction in Progress: 2009-2018

Historic Construction in Progress for Fluor (FLR) over the last 10 years, with Dec 2018 value amounting to $53.1 million.

  • Fluor's Construction in Progress fell 14.73% to $53.1 million in Q4 2018 from the same period last year, while for Dec 2018 it was $53.1 million, marking a year-over-year decrease of 14.73%. This contributed to the annual value of $53.1 million for FY2018, which is 14.73% down from last year.
  • Latest data reveals that Fluor reported Construction in Progress of $53.1 million as of FY2018, which was down 14.73% from $62.2 million recorded in FY2017.
  • In the past 5 years, Fluor's Construction in Progress ranged from a high of $74.0 million in FY2014 and a low of $43.6 million during FY2015.
  • In the last 3 years, Fluor's Construction in Progress had a median value of $53.1 million in 2018 and averaged $55.1 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 43.33% in 2014, then tumbled by 40.99% in 2015.
  • Over the past 5 years, Fluor's Construction in Progress (Yearly) stood at $74.0 million in 2014, then crashed by 40.99% to $43.6 million in 2015, then rose by 14.67% to $50.0 million in 2016, then grew by 24.36% to $62.2 million in 2017, then decreased by 14.73% to $53.1 million in 2018.