Flowco Holdings (FLOC) Construction in Progress (2024 - 2025)
Flowco Holdings' Construction in Progress history spans 2 years, with the latest figure at $3.2 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 55.58% year-over-year to $3.2 million; the TTM value through Dec 2025 reached $3.2 million, down 55.58%, while the annual FY2025 figure was $3.2 million, 55.58% down from the prior year.
- Construction in Progress for Q4 2025 was $3.2 million at Flowco Holdings, down from $6.5 million in the prior quarter.
- Across five years, Construction in Progress topped out at $7.1 million in Q4 2024 and bottomed at $3.2 million in Q4 2025.