Growth Metrics

National Beverage (FIZZ) Construction in Progress (2024 - 2026)

National Beverage (FIZZ) has disclosed Construction in Progress for 3 consecutive years, with $33.8 million as the latest value for Q1 2026.

  • Quarterly Construction in Progress fell 19.52% to $33.8 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $33.8 million through Jan 2026, down 19.52% year-over-year, with the annual reading at $37.7 million for FY2025, 16.0% up from the prior year.
  • Construction in Progress hit $33.8 million in Q1 2026 for National Beverage, down from $34.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $42.0 million in Q1 2025 to a low of $32.5 million in Q2 2024.
  • Historically, Construction in Progress has averaged $36.4 million across 3 years, with a median of $35.5 million in 2024.
  • Biggest five-year swings in Construction in Progress: rose 16.0% in 2025 and later dropped 19.52% in 2026.
  • Year by year, Construction in Progress stood at $35.5 million in 2024, then fell by 2.82% to $34.5 million in 2025, then dropped by 2.03% to $33.8 million in 2026.
  • Business Quant data shows Construction in Progress for FIZZ at $33.8 million in Q1 2026, $34.5 million in Q4 2025, and $39.0 million in Q3 2025.