Cash Flow Statement
Growth Metrics

Fortune Brands Innovations (FBIN) Construction in Progress (2016 - 2025)

Fortune Brands Innovations (FBIN) has disclosed Construction in Progress for 15 consecutive years, with $156.6 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 56.21% to $156.6 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $156.6 million through Dec 2025, down 56.21% year-over-year, with the annual reading at $156.6 million for FY2025, 56.21% down from the prior year.
  • Construction in Progress for Q4 2025 was $156.6 million at Fortune Brands Innovations, down from $357.6 million in the prior quarter.
  • The five-year high for Construction in Progress was $383.2 million in Q4 2023, with the low at $141.8 million in Q4 2021.
  • Average Construction in Progress over 5 years is $252.9 million, with a median of $225.1 million recorded in 2022.
  • The sharpest move saw Construction in Progress skyrocketed 70.24% in 2023, then tumbled 56.21% in 2025.
  • Over 5 years, Construction in Progress stood at $141.8 million in 2021, then surged by 58.74% to $225.1 million in 2022, then surged by 70.24% to $383.2 million in 2023, then dropped by 6.68% to $357.6 million in 2024, then crashed by 56.21% to $156.6 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $156.6 million, $357.6 million, and $383.2 million for Q4 2025, Q4 2024, and Q4 2023 respectively.