Endeavour Silver (EXK) Construction in Progress (2013 - 2021)
Endeavour Silver (EXK) reported Construction in Progress of $9.7 million for Q4 2021, up 6.19% year-on-year from $9.1 million in Q4 2020, and up 6.19% quarter-over-quarter from $9.1 million in Q4 2020.
Endeavour Silver (EXK) has 6 years of Construction in Progress data on file, last reported at $9.7 million in Q4 2021.
- For the quarter ending Q4 2021, Construction in Progress rose 6.19% year-over-year to $9.7 million; the trailing twelve-month figure through Dec 2021 stood at $9.7 million (up 6.19% YoY), and the FY2021 full-year result was $9.7 million, up 6.19% from the prior year.
- Construction in Progress for Q4 2021 stood at $9.7 million, up from $9.1 million in the prior quarter.
- Across five years, Construction in Progress topped out at $20599.0 billion in Q4 2017 and bottomed at $9.1 million in Q4 2020.
- A 3-year average of $6866.3 billion and a median of $9.7 million in 2021 frame the typical range for Construction in Progress.
- Across the five-year window, Construction in Progress soared 54.23% in 2017 and gained 6.19% in 2021, its largest moves.
- Tracing EXK's Construction in Progress over 3 years: stood at $20599.0 billion in 2017, then sank by 100.0% to $9.1 million in 2020, then grew by 6.19% to $9.7 million in 2021.
- According to Business Quant data, Construction in Progress over the past three periods registered $9.7 million, $9.1 million, and $20599.0 billion for Q4 2021, Q4 2020, and Q4 2017 respectively.
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2021 | 9.71 Mn |
| Dec 31, 2020 | 9.15 Mn |
| Dec 31, 2017 | 20,599.00 Bn |
| Dec 31, 2016 | 13,356.44 Bn |
| Dec 31, 2015 | 6.06 Mn |
| Dec 31, 2013 | 7.20 Mn |