Growth Metrics

Esco Technologies (ESE) Construction in Progress (2016 - 2025)

Esco Technologies (ESE) has disclosed Construction in Progress for 17 consecutive years, with $20.6 million as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress rose 55.1% to $20.6 million in Q3 2025 year-over-year; TTM through Sep 2025 was $20.6 million, a 55.1% increase, with the full-year FY2025 number at $20.6 million, up 55.1% from a year prior.
  • Construction in Progress was $20.6 million for Q3 2025 at Esco Technologies, up from $13.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $20.6 million in Q3 2025 to a low of $5.5 million in Q3 2021.
  • A 5-year average of $13.8 million and a median of $13.3 million in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 33.96% in 2021, then skyrocketed 108.84% in 2022.
  • Esco Technologies' Construction in Progress stood at $5.5 million in 2021, then surged by 108.84% to $11.6 million in 2022, then soared by 56.95% to $18.2 million in 2023, then decreased by 26.94% to $13.3 million in 2024, then skyrocketed by 55.1% to $20.6 million in 2025.
  • Per Business Quant, the three most recent readings for ESE's Construction in Progress are $20.6 million (Q3 2025), $13.3 million (Q3 2024), and $18.2 million (Q3 2023).