Enovix (ENVX) Construction in Progress (2020 - 2022)
Historic Construction in Progress for Enovix (ENVX) over the last 3 years, with Q2 2022 value amounting to $77.9 million.
- Enovix's Construction in Progress changed N/A to $77.9 million in Q2 2022 from the same period last year, while for Apr 2022 it was $77.9 million, marking a year-over-year change of. This contributed to the annual value of $71.1 million for FY2022, which is 14057.43% up from last year.
- As of Q2 2022, Enovix's Construction in Progress stood at $77.9 million.
- In the past 5 years, Enovix's Construction in Progress ranged from a high of $77.9 million in Q2 2022 and a low of $29.6 million during Q4 2020
- Over the past 3 years, Enovix's median Construction in Progress value was $63.9 million (recorded in 2021), while the average stood at $58.8 million.
- Within the past 5 years, the most significant YoY rise in Enovix's Construction in Progress was 14057.43% (2022), while the steepest drop was 14057.43% (2022).
- Enovix's Construction in Progress (Quarter) stood at $29.6 million in 2020, then soared by 91.67% to $56.7 million in 2021, then skyrocketed by 37.45% to $77.9 million in 2022.
- Its last three reported values are $77.9 million in Q2 2022, $71.1 million for Q1 2022, and $56.7 million during Q4 2021.