Growth Metrics

Energizer Holdings (ENR) Construction in Progress (2016 - 2025)

Energizer Holdings' Construction in Progress history spans 12 years, with the latest figure at $45.3 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 43.38% year-over-year to $45.3 million; the TTM value through Dec 2025 reached $45.3 million, down 43.38%, while the annual FY2025 figure was $44.6 million, 19.78% down from the prior year.
  • Construction in Progress reached $45.3 million in Q4 2025 per ENR's latest filing, up from $44.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $80.3 million in Q4 2023 to a low of $39.0 million in Q3 2022.
  • Average Construction in Progress over 5 years is $54.2 million, with a median of $52.0 million recorded in 2025.
  • Peak YoY movement for Construction in Progress: surged 104.33% in 2023, then tumbled 43.38% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $52.5 million in 2021, then dropped by 25.14% to $39.3 million in 2022, then soared by 104.33% to $80.3 million in 2023, then fell by 0.37% to $80.0 million in 2024, then crashed by 43.38% to $45.3 million in 2025.
  • Per Business Quant, the three most recent readings for ENR's Construction in Progress are $45.3 million (Q4 2025), $44.6 million (Q3 2025), and $52.0 million (Q2 2025).