EHang Holdings (EH) Construction in Progress (2020 - 2024)
EHang Holdings has reported Construction in Progress over the past 5 years, most recently at $2.4 million for Q4 2024.
- Quarterly results put Construction in Progress at $2.4 million for Q4 2024, up 1017.14% from a year ago — trailing twelve months through Dec 2024 was $2.4 million (up 1017.14% YoY), and the annual figure for FY2024 was $2.3 million, up 982.33%.
- Construction in Progress for Q4 2024 was $2.4 million at EHang Holdings, up from $211664.4 in the prior quarter.
- Over the last five years, Construction in Progress for EH hit a ceiling of $2.4 million in Q4 2024 and a floor of $211664.4 in Q4 2023.
- Median Construction in Progress over the past 5 years was $269024.5 (2021), compared with a mean of $983481.0.
- Biggest five-year swings in Construction in Progress: crashed 85.11% in 2021 and later skyrocketed 1017.14% in 2024.
- EHang Holdings' Construction in Progress stood at $1.8 million in 2020, then crashed by 85.11% to $269024.5 in 2021, then decreased by 1.48% to $265038.7 in 2022, then fell by 20.14% to $211664.4 in 2023, then skyrocketed by 1017.14% to $2.4 million in 2024.
- The last three reported values for Construction in Progress were $2.4 million (Q4 2024), $211664.4 (Q4 2023), and $265038.7 (Q4 2022) per Business Quant data.