Growth Metrics

EHang Holdings (EH) Construction in Progress (2018 - 2024)

EHang Holdings has reported Construction in Progress over the past 7 years, most recently at $2.4 million for Q4 2024.

  • For Q4 2024, Construction in Progress rose 1017.14% year-over-year to $2.4 million; the TTM value through Dec 2024 reached $2.4 million, up 1017.14%, while the annual FY2024 figure was $2.3 million, 982.33% up from the prior year.
  • Construction in Progress for Q4 2024 was $2.4 million at EHang Holdings, up from $211664.4 in the prior quarter.
  • Over five years, Construction in Progress peaked at $2.4 million in Q4 2024 and troughed at $211664.4 in Q4 2023.
  • A 5-year average of $983480.9 and a median of $269024.5 in 2021 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: tumbled 85.11% in 2021 and later skyrocketed 1017.14% in 2024.
  • Year by year, Construction in Progress stood at $1.8 million in 2020, then tumbled by 85.11% to $269024.5 in 2021, then decreased by 1.48% to $265038.7 in 2022, then decreased by 20.14% to $211664.4 in 2023, then skyrocketed by 1017.14% to $2.4 million in 2024.
  • Business Quant data shows Construction in Progress for EH at $2.4 million in Q4 2024, $211664.4 in Q4 2023, and $265038.7 in Q4 2022.