EHang Holdings (EH) Construction in Progress (2019 - 2024)
Historic Construction in Progress for EHang Holdings (EH) over the last 6 years, with Q4 2024 value amounting to $2.4 million.
- EHang Holdings' Construction in Progress rose 101713.58% to $2.4 million in Q4 2024 from the same period last year, while for Dec 2024 it was $2.4 million, marking a year-over-year increase of 101713.58%. This contributed to the annual value of $2.3 million for FY2024, which is 98232.56% up from last year.
- Latest data reveals that EHang Holdings reported Construction in Progress of $2.4 million as of Q4 2024, which was up 101713.58% from $211664.4 recorded in Q4 2023.
- In the past 5 years, EHang Holdings' Construction in Progress ranged from a high of $2.4 million in Q4 2024 and a low of $211664.4 during Q4 2023
- Moreover, its 5-year median value for Construction in Progress was $269024.5 (2021), whereas its average is $983480.9.
- As far as peak fluctuations go, EHang Holdings' Construction in Progress plummeted by 8511.29% in 2021, and later skyrocketed by 101713.58% in 2024.
- Over the past 5 years, EHang Holdings' Construction in Progress (Quarter) stood at $1.8 million in 2020, then plummeted by 85.11% to $269024.5 in 2021, then decreased by 1.48% to $265038.7 in 2022, then fell by 20.14% to $211664.4 in 2023, then soared by 1017.14% to $2.4 million in 2024.
- Its last three reported values are $2.4 million in Q4 2024, $211664.4 for Q4 2023, and $265038.7 during Q4 2022.