Everus Construction (ECG) Other Accumulated Expenses (2023 - 2025)
Historic Other Accumulated Expenses for Everus Construction (ECG) over the last 3 years, with Q3 2025 value amounting to $43.8 million.
- Everus Construction's Other Accumulated Expenses rose 1743.54% to $43.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $43.8 million, marking a year-over-year increase of 1743.54%. This contributed to the annual value of $39.0 million for FY2024, which is 1033.61% up from last year.
- As of Q3 2025, Everus Construction's Other Accumulated Expenses stood at $43.8 million, which was up 1743.54% from $44.7 million recorded in Q2 2025.
- Everus Construction's 5-year Other Accumulated Expenses high stood at $44.7 million for Q2 2025, and its period low was $35.3 million during Q4 2023.
- Its 3-year average for Other Accumulated Expenses is $40.6 million, with a median of $41.3 million in 2024.
- In the last 5 years, Everus Construction's Other Accumulated Expenses soared by 1033.61% in 2024 and then surged by 1743.54% in 2025.
- Over the past 3 years, Everus Construction's Other Accumulated Expenses (Quarter) stood at $35.3 million in 2023, then grew by 10.34% to $39.0 million in 2024, then increased by 12.31% to $43.8 million in 2025.
- Its last three reported values are $43.8 million in Q3 2025, $44.7 million for Q2 2025, and $43.5 million during Q1 2025.