Ducommun (DCO) Construction in Progress (2016)
Ducommun's Construction in Progress history spans 6 years, with the latest figure at $12.2 million for Q4 2016.
- For Q4 2016, Construction in Progress fell 7.26% year-over-year to $12.2 million; the TTM value through Dec 2016 reached $12.2 million, down 7.26%, while the annual FY2016 figure was $12.2 million, 7.26% down from the prior year.
- Construction in Progress reached $12.2 million in Q4 2016 per DCO's latest filing, down from $13.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $13.2 million in Q4 2015 to a low of $7.1 million in Q4 2012.
- Average Construction in Progress over 5 years is $10.3 million, with a median of $9.6 million recorded in 2014.
- Peak YoY movement for Construction in Progress: decreased 19.0% in 2012, then soared 36.82% in 2015.
- A 5-year view of Construction in Progress shows it stood at $7.1 million in 2012, then increased by 27.21% to $9.1 million in 2013, then rose by 6.16% to $9.6 million in 2014, then surged by 36.82% to $13.2 million in 2015, then dropped by 7.26% to $12.2 million in 2016.
- Per Business Quant, the three most recent readings for DCO's Construction in Progress are $12.2 million (Q4 2016), $13.2 million (Q4 2015), and $9.6 million (Q4 2014).