Cpi Aerostructures (CVU) Raw Materials (2017 - 2025)
Cpi Aerostructures (CVU) has disclosed Raw Materials for 7 consecutive years, with $524883.0 as the latest value for Q4 2025.
- Quarterly Raw Materials rose 26.54% to $524883.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $524883.0 through Dec 2025, up 26.54% year-over-year, with the annual reading at $524883.0 for FY2025, 26.54% up from the prior year.
- Raw Materials hit $524883.0 in Q4 2025 for Cpi Aerostructures, up from $275888.0 in the prior quarter.
- In the past five years, Raw Materials ranged from a high of $719596.0 in Q2 2025 to a low of $275888.0 in Q3 2025.
- Historically, Raw Materials has averaged $494696.8 across 3 years, with a median of $482449.5 in 2024.
- Biggest YoY gain for Raw Materials was 33.95% in 2025; the steepest drop was 37.3% in 2025.
- Year by year, Raw Materials stood at $648264.0 in 2023, then tumbled by 36.01% to $414806.0 in 2024, then rose by 26.54% to $524883.0 in 2025.
- Business Quant data shows Raw Materials for CVU at $524883.0 in Q4 2025, $275888.0 in Q3 2025, and $719596.0 in Q2 2025.