Cpi Aerostructures (CVU) Non-Current Assets (2010 - 2026)
Cpi Aerostructures (CVU) reported Non-Current Assets of $31.3 million for Q1 2026, up 29.25% on a YoY basis from $24.2 million in Q1 2025, and down 1.58% sequentially from $31.8 million in Q4 2025.
Cpi Aerostructures (CVU) Non-Current Assets (2010 - 2026) Analysis & Trends
Cpi Aerostructures (CVU) has 17 years of Non-Current Assets data on file, last reported at $31.3 million in Q1 2026.
- For the quarter ending Q1 2026, Non-Current Assets rose 29.25% year-over-year to $31.3 million; the trailing twelve-month figure through Mar 2026 stood at $128.4 million (up 28.01% YoY), and the FY2025 full-year result was $31.8 million, up 30.53% from the prior year.
- Non-Current Assets retreated to $31.3 million in Q1 2026, from $31.8 million in the prior quarter.
- In the past five years, Non-Current Assets ranged from a high of $32.9 million in Q2 2025 to a low of $10.1 million in Q3 2022.
- A 5-year average of $22.1 million and a median of $24.4 million in 2024 frame the typical range for Non-Current Assets.
- Peak annual rise in Non-Current Assets reached 80.53% in 2024, while the deepest fall reached 11.14% in 2024.
- Tracing CVU's Non-Current Assets over 5 years: stood at $16.2 million in 2022, then soared by 68.92% to $27.4 million in 2023, then decreased by 11.14% to $24.4 million in 2024, then jumped by 30.53% to $31.8 million in 2025, then dropped by 1.58% to $31.3 million in 2026.
- Business Quant data shows CVU's Non-Current Assets at $31.3 million in Q1 2026, $31.8 million in Q4 2025, and $32.3 million in Q3 2025.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Non-Current Assets (Qtr) |
|---|---|---|---|---|---|
| 1 | General Electric | 376.06 Bn | 366.71 Bn | -3.10 Bn | 87.98 Bn |
| 2 | Rtx | 290.71 Bn | 282.41 Bn | 9.91 Bn | 1.25 Bn |
| 3 | Boeing | 170.38 Bn | 150.36 Bn | 2.41 Bn | 41.24 Bn |
| 4 | Lockheed Martin | 133.55 Bn | 129.76 Bn | 2.45 Bn | 34.05 Bn |
| 5 | Howmet Aerospace | 114.08 Bn | 111.65 Bn | 854.00 Mn | 7.41 Bn |
| 6 | General Dynamics | 103.42 Bn | 99.09 Bn | 6.76 Bn | 33.13 Bn |
| 7 | Northrop Grumman | 77.20 Bn | 74.89 Bn | 3.72 Bn | 35.17 Bn |
| 8 | TransDigm | 73.58 Bn | 69.70 Bn | 1.51 Bn | 16.86 Bn |
| 9 | L3Harris Technologies | 51.83 Bn | 51.24 Bn | 1.40 Bn | 32.49 Bn |
| 10 | Cpi Aerostructures | 63.67 Mn | 62.67 Mn | 4.48 Mn | 31.33 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2026 | 31.33 Mn |
| Dec 31, 2025 | 31.84 Mn |
| Sep 30, 2025 | 32.27 Mn |
| Jun 30, 2025 | 32.93 Mn |
| Mar 31, 2025 | 24.24 Mn |
| Dec 31, 2024 | 24.39 Mn |
| Sep 30, 2024 | 25.51 Mn |
| Jun 30, 2024 | 26.13 Mn |
| Mar 31, 2024 | 26.88 Mn |
| Dec 31, 2023 | 27.45 Mn |
| Sep 30, 2023 | 14.13 Mn |
| Jun 30, 2023 | 14.89 Mn |
| Mar 31, 2023 | 15.51 Mn |
| Dec 31, 2022 | 16.25 Mn |
| Sep 30, 2022 | 10.08 Mn |
| Jun 30, 2022 | 10.50 Mn |
| Mar 31, 2022 | 11.08 Mn |
| Dec 31, 2021 | 11.73 Mn |
| Sep 30, 2021 | 6.72 Mn |
| Jun 30, 2021 | 7.43 Mn |