Growth Metrics

Culp (CULP) Construction in Progress (2016)

Historic Construction in Progress for Culp (CULP) over the last 5 years, with Q2 2016 value amounting to $2.9 million.

  • Culp's Construction in Progress rose 4730.42% to $2.9 million in Q2 2016 from the same period last year, while for May 2016 it was $2.9 million, marking a year-over-year increase of 4730.42%. This contributed to the annual value of $2.9 million for FY2016, which is 4730.42% up from last year.
  • Culp's Construction in Progress amounted to $2.9 million in Q2 2016, which was up 4730.42% from $2.0 million recorded in Q2 2015.
  • Culp's 5-year Construction in Progress high stood at $3.9 million for Q2 2014, and its period low was $1.1 million during Q2 2012.
  • Its 5-year average for Construction in Progress is $2.3 million, with a median of $2.0 million in 2015.
  • In the last 5 years, Culp's Construction in Progress skyrocketed by 12740.91% in 2014 and then plummeted by 5011.42% in 2015.
  • Over the past 5 years, Culp's Construction in Progress (Quarter) stood at $1.1 million in 2012, then soared by 63.18% to $1.7 million in 2013, then soared by 127.41% to $3.9 million in 2014, then tumbled by 50.11% to $2.0 million in 2015, then surged by 47.3% to $2.9 million in 2016.
  • Its last three reported values are $2.9 million in Q2 2016, $2.0 million for Q2 2015, and $3.9 million during Q2 2014.