Csw Industrials (CSW) Construction in Progress (2017 - 2025)
Csw Industrials has reported Construction in Progress over the past 11 years, most recently at $10.3 million for Q1 2025.
- For Q1 2025, Construction in Progress fell 9.76% year-over-year to $10.3 million; the TTM value through Mar 2025 reached $10.3 million, down 9.76%, while the annual FY2025 figure was $10.3 million, 9.76% down from the prior year.
- Construction in Progress for Q1 2025 was $10.3 million at Csw Industrials, down from $11.4 million in the prior quarter.
- Over five years, Construction in Progress peaked at $12.5 million in Q1 2023 and troughed at $3.5 million in Q1 2021.
- A 5-year average of $9.7 million and a median of $11.1 million in 2022 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: tumbled 57.59% in 2021 and later surged 220.13% in 2022.
- Year by year, Construction in Progress stood at $3.5 million in 2021, then surged by 220.13% to $11.1 million in 2022, then rose by 12.48% to $12.5 million in 2023, then dropped by 8.48% to $11.4 million in 2024, then dropped by 9.76% to $10.3 million in 2025.
- Business Quant data shows Construction in Progress for CSW at $10.3 million in Q1 2025, $11.4 million in Q1 2024, and $12.5 million in Q1 2023.