Csw Industrials (CSW) Construction in Progress (2017 - 2025)
Csw Industrials has reported Construction in Progress over the past 11 years, most recently at $10.3 million for Q1 2025.
- Quarterly results put Construction in Progress at $10.3 million for Q1 2025, down 9.76% from a year ago — trailing twelve months through Mar 2025 was $10.3 million (down 9.76% YoY), and the annual figure for FY2025 was $10.3 million, down 9.76%.
- Construction in Progress for Q1 2025 was $10.3 million at Csw Industrials, down from $11.4 million in the prior quarter.
- Over the last five years, Construction in Progress for CSW hit a ceiling of $12.5 million in Q1 2023 and a floor of $3.5 million in Q1 2021.
- Median Construction in Progress over the past 5 years was $11.1 million (2022), compared with a mean of $9.7 million.
- Biggest five-year swings in Construction in Progress: plummeted 57.59% in 2021 and later skyrocketed 220.13% in 2022.
- Csw Industrials' Construction in Progress stood at $3.5 million in 2021, then skyrocketed by 220.13% to $11.1 million in 2022, then increased by 12.48% to $12.5 million in 2023, then fell by 8.48% to $11.4 million in 2024, then fell by 9.76% to $10.3 million in 2025.
- The last three reported values for Construction in Progress were $10.3 million (Q1 2025), $11.4 million (Q1 2024), and $12.5 million (Q1 2023) per Business Quant data.