KPIs & Operating Metrics(New)

Canadian Solar (CSIQ) Construction in Progress (2016 - 2024)

Canadian Solar's Construction in Progress history spans 10 years, with the latest figure at $579.2 million for Q4 2024.

  • For the quarter ending Q4 2024, Construction in Progress fell 14.14% year-over-year to $579.2 million, compared with a TTM value of $579.2 million through Dec 2024, down 14.14%, and an annual FY2024 reading of $579.2 million, down 14.14% over the prior year.
  • Construction in Progress for Q4 2024 was $579.2 million at Canadian Solar, down from $674.6 million in the prior quarter.
  • The five-year high for Construction in Progress was $674.6 million in Q4 2023, with the low at $101.0 million in Q4 2021.
  • Average Construction in Progress over 5 years is $381.6 million, with a median of $359.4 million recorded in 2022.
  • Year-over-year, Construction in Progress tumbled 47.87% in 2021 and then skyrocketed 255.87% in 2022.
  • Tracing CSIQ's Construction in Progress over 5 years: stood at $193.7 million in 2020, then plummeted by 47.87% to $101.0 million in 2021, then skyrocketed by 255.87% to $359.4 million in 2022, then surged by 87.73% to $674.6 million in 2023, then dropped by 14.14% to $579.2 million in 2024.
  • Per Business Quant, the three most recent readings for CSIQ's Construction in Progress are $579.2 million (Q4 2024), $674.6 million (Q4 2023), and $359.4 million (Q4 2022).