KPIs & Operating Metrics(New)
Growth Metrics

Coherent (COHR) Construction in Progress: 2010-2016

Historic Construction in Progress for Coherent (COHR) over the last 7 years, with Jun 2016 value amounting to $34.6 million.

  • Coherent's Construction in Progress rose 94.95% to $34.6 million in Q2 2016 from the same period last year, while for Jun 2016 it was $34.6 million, marking a year-over-year increase of 94.95%. This contributed to the annual value of $34.6 million for FY2016, which is 94.95% up from last year.
  • As of FY2016, Coherent's Construction in Progress stood at $34.6 million, which was up 94.95% from $17.7 million recorded in FY2015.
  • Coherent's 5-year Construction in Progress high stood at $34.6 million for FY2016, and its period low was $10.8 million during FY2013.
  • Over the past 3 years, Coherent's median Construction in Progress value was $17.7 million (recorded in 2015), while the average stood at $23.1 million.
  • Per our database at Business Quant, Coherent's Construction in Progress plummeted by 38.51% in 2013 and then surged by 94.95% in 2016.
  • Yearly analysis of 5 years shows Coherent's Construction in Progress stood at $17.6 million in 2012, then tumbled by 38.51% to $10.8 million in 2013, then surged by 56.86% to $17.0 million in 2014, then climbed by 4.47% to $17.7 million in 2015, then soared by 94.95% to $34.6 million in 2016.