Coherent (COHR) Construction in Progress: 2010-2016
Historic Construction in Progress for Coherent (COHR) over the last 5 years, with Jun 2016 value amounting to $34.6 million.
- Coherent's Construction in Progress rose 94.95% to $34.6 million in Q2 2016 from the same period last year, while for Jun 2016 it was $34.6 million, marking a year-over-year increase of 94.95%. This contributed to the annual value of $34.6 million for FY2016, which is 94.95% up from last year.
- According to the latest figures from Q2 2016, Coherent's Construction in Progress is $34.6 million, which was up 9.99% from $31.5 million recorded in Q1 2016.
- In the past 5 years, Coherent's Construction in Progress ranged from a high of $34.6 million in Q2 2016 and a low of $10.8 million during Q2 2013.
- Its 3-year average for Construction in Progress is $22.4 million, with a median of $21.2 million in 2015.
- In the last 5 years, Coherent's Construction in Progress slumped by 38.51% in 2013 and then surged by 94.95% in 2016.
- Coherent's Construction in Progress (Quarterly) stood at $16.2 million in 2012, then dropped by 26.75% to $11.8 million in 2013, then spiked by 87.81% to $22.2 million in 2014, then climbed by 9.48% to $24.3 million in 2015, then spiked by 94.95% to $34.6 million in 2016.
- Its last three reported values are $34.6 million in Q2 2016, $31.5 million for Q1 2016, and $24.3 million during Q4 2015.