KPIs & Operating Metrics(New)
Growth Metrics

Coherent (COHR) Construction in Progress (2016)

Historic Construction in Progress for Coherent (COHR) over the last 7 years, with Q2 2016 value amounting to $34.6 million.

  • Coherent's Construction in Progress rose 9495.18% to $34.6 million in Q2 2016 from the same period last year, while for Jun 2016 it was $34.6 million, marking a year-over-year increase of 9495.18%. This contributed to the annual value of $34.6 million for FY2016, which is 9495.18% up from last year.
  • According to the latest figures from Q2 2016, Coherent's Construction in Progress is $34.6 million, which was up 9495.18% from $31.5 million recorded in Q1 2016.
  • Coherent's Construction in Progress' 5-year high stood at $34.6 million during Q2 2016, with a 5-year trough of $10.8 million in Q2 2013.
  • In the last 5 years, Coherent's Construction in Progress had a median value of $17.5 million in 2012 and averaged $18.8 million.
  • As far as peak fluctuations go, Coherent's Construction in Progress tumbled by 3850.91% in 2013, and later skyrocketed by 9495.18% in 2016.
  • Coherent's Construction in Progress (Quarter) stood at $16.2 million in 2012, then dropped by 26.75% to $11.8 million in 2013, then skyrocketed by 87.81% to $22.2 million in 2014, then grew by 9.48% to $24.3 million in 2015, then soared by 42.2% to $34.6 million in 2016.
  • Its last three reported values are $34.6 million in Q2 2016, $31.5 million for Q1 2016, and $24.3 million during Q4 2015.