Cmb.Tech (CMBT) Construction in Progress (2016 - 2024)

Cmb.Tech's Construction in Progress history spans 7 years, with the latest figure at $628.4 million for Q4 2024.

  • For Q4 2024, Construction in Progress rose 489.98% year-over-year to $628.4 million; the TTM value through Dec 2024 reached $628.4 million, up 489.98%, while the annual FY2024 figure was $628.4 million, 489.98% up from the prior year.
  • Construction in Progress reached $628.4 million in Q4 2024 per CMBT's latest filing, up from $106.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $628.4 million in Q4 2024 to a low of $106.5 million in Q4 2023.
  • Average Construction in Progress over 5 years is $270.3 million, with a median of $207.1 million recorded in 2020.
  • Peak YoY movement for Construction in Progress: plummeted 53.37% in 2023, then skyrocketed 489.98% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $207.1 million in 2020, then decreased by 12.45% to $181.3 million in 2021, then increased by 26.0% to $228.4 million in 2022, then tumbled by 53.37% to $106.5 million in 2023, then surged by 489.98% to $628.4 million in 2024.
  • Per Business Quant, the three most recent readings for CMBT's Construction in Progress are $628.4 million (Q4 2024), $106.5 million (Q4 2023), and $228.4 million (Q4 2022).