KPIs & Operating Metrics(New)

Canadian Imperial Bank Of Commerce (CM) Construction in Progress (2019 - 2025)

Canadian Imperial Bank Of Commerce filings provide 7 years of Construction in Progress readings, the most recent being $307.8 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 114.46% to $307.8 million in Q4 2025 year-over-year; TTM through Oct 2025 was $307.8 million, a 114.46% increase, with the full-year FY2025 number at $307.8 million, up 114.46% from a year prior.
  • Construction in Progress hit $307.8 million in Q4 2025 for Canadian Imperial Bank Of Commerce, up from $143.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $307.8 million in Q4 2025 to a low of $126.8 million in Q4 2023.
  • Median Construction in Progress over the past 5 years was $182.2 million (2022), compared with a mean of $189.3 million.
  • Biggest five-year swings in Construction in Progress: tumbled 30.38% in 2023 and later skyrocketed 114.46% in 2025.
  • Canadian Imperial Bank Of Commerce's Construction in Progress stood at $186.1 million in 2021, then decreased by 2.11% to $182.2 million in 2022, then tumbled by 30.38% to $126.8 million in 2023, then rose by 13.15% to $143.5 million in 2024, then skyrocketed by 114.46% to $307.8 million in 2025.
  • The last three reported values for Construction in Progress were $307.8 million (Q4 2025), $143.5 million (Q4 2024), and $126.8 million (Q4 2023) per Business Quant data.