Canadian Imperial Bank Of Commerce (CM) Construction in Progress (2019 - 2025)
Canadian Imperial Bank Of Commerce's Construction in Progress history spans 7 years, with the latest figure at $307.8 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 114.46% year-over-year to $307.8 million; the TTM value through Oct 2025 reached $307.8 million, up 114.46%, while the annual FY2025 figure was $305.0 million, 111.73% up from the prior year.
- Construction in Progress reached $307.8 million in Q4 2025 per CM's latest filing, up from $143.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $307.8 million in Q4 2025 to a low of $126.8 million in Q4 2023.
- Average Construction in Progress over 5 years is $189.3 million, with a median of $182.2 million recorded in 2022.
- Peak YoY movement for Construction in Progress: tumbled 30.38% in 2023, then soared 114.46% in 2025.
- A 5-year view of Construction in Progress shows it stood at $186.1 million in 2021, then dropped by 2.11% to $182.2 million in 2022, then crashed by 30.38% to $126.8 million in 2023, then increased by 13.15% to $143.5 million in 2024, then skyrocketed by 114.46% to $307.8 million in 2025.
- Per Business Quant, the three most recent readings for CM's Construction in Progress are $307.8 million (Q4 2025), $143.5 million (Q4 2024), and $126.8 million (Q4 2023).