KPIs & Operating Metrics(New)

Canadian Imperial Bank Of Commerce (CM) Construction in Progress (2019 - 2025)

Historic Construction in Progress for Canadian Imperial Bank Of Commerce (CM) over the last 7 years, with Q4 2025 value amounting to $307.7 million.

  • Canadian Imperial Bank Of Commerce's Construction in Progress rose 11440.55% to $307.7 million in Q4 2025 from the same period last year, while for Oct 2025 it was $307.7 million, marking a year-over-year increase of 11440.55%. This contributed to the annual value of $305.1 million for FY2025, which is 11177.31% up from last year.
  • According to the latest figures from Q4 2025, Canadian Imperial Bank Of Commerce's Construction in Progress is $307.7 million, which was up 11440.55% from $143.5 million recorded in Q4 2024.
  • Canadian Imperial Bank Of Commerce's 5-year Construction in Progress high stood at $307.7 million for Q4 2025, and its period low was $126.8 million during Q4 2023.
  • In the last 5 years, Canadian Imperial Bank Of Commerce's Construction in Progress had a median value of $182.2 million in 2022 and averaged $189.3 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 3037.96% in 2023, then soared by 11440.55% in 2025.
  • Quarter analysis of 5 years shows Canadian Imperial Bank Of Commerce's Construction in Progress stood at $186.1 million in 2021, then dropped by 2.11% to $182.2 million in 2022, then tumbled by 30.38% to $126.8 million in 2023, then increased by 13.15% to $143.5 million in 2024, then skyrocketed by 114.41% to $307.7 million in 2025.
  • Its Construction in Progress was $307.7 million in Q4 2025, compared to $143.5 million in Q4 2024 and $126.8 million in Q4 2023.