Cleanspark (CLSK) Construction in Progress: 2021-2025
Historic Construction in Progress for Cleanspark (CLSK) over the last 5 years, with Sep 2025 value amounting to $12.8 million.
- Cleanspark's Construction in Progress fell 34.27% to $12.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $12.8 million, marking a year-over-year decrease of 34.27%. This contributed to the annual value of $12.8 million for FY2025, which is 34.27% down from last year.
- According to the latest figures from FY2025, Cleanspark's Construction in Progress is $12.8 million, which was down 34.27% from $19.5 million recorded in FY2024.
- Cleanspark's Construction in Progress' 5-year high stood at $81.9 million during FY2023, with a 5-year trough of $4.8 million in FY2022.
- Over the past 3 years, Cleanspark's median Construction in Progress value was $19.5 million (recorded in 2024), while the average stood at $38.0 million.
- As far as peak fluctuations go, Cleanspark's Construction in Progress spiked by 1,600.06% in 2023, and later crashed by 76.24% in 2024.
- Cleanspark's Construction in Progress (Yearly) stood at $10.5 million in 2021, then crashed by 54.13% to $4.8 million in 2022, then spiked by 1,600.06% to $81.9 million in 2023, then slumped by 76.24% to $19.5 million in 2024, then tumbled by 34.27% to $12.8 million in 2025.