Cleanspark (CLSK) Construction in Progress (2021 - 2026)

Cleanspark has reported Construction in Progress over the past 6 years, most recently at $44.0 million for Q1 2026.

  • Quarterly Construction in Progress rose 16.99% to $44.0 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $44.0 million through Mar 2026, up 16.99% year-over-year, with the annual reading at $12.8 million for FY2025, 34.27% down from the prior year.
  • Construction in Progress was $44.0 million for Q1 2026 at Cleanspark, up from $32.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $81.9 million in Q3 2023 and troughed at $2.4 million in Q4 2022.
  • The 5-year median for Construction in Progress is $19.3 million (2023), against an average of $27.6 million.
  • The largest YoY upside for Construction in Progress was 4583.65% in 2022 against a maximum downside of 77.64% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $2.4 million in 2022, then surged by 2603.88% to $64.8 million in 2023, then fell by 18.98% to $52.5 million in 2024, then crashed by 38.99% to $32.0 million in 2025, then surged by 37.49% to $44.0 million in 2026.
  • Per Business Quant, the three most recent readings for CLSK's Construction in Progress are $44.0 million (Q1 2026), $32.0 million (Q4 2025), and $12.8 million (Q3 2025).