Cadre Holdings CDRE
NYSE CDRE
$33.85 -0.24 (-0.70%)
At close: Aug 20, 2026 · 4:00 PM EDT

Cadre Holdings (CDRE) Work In Process (2020 - 2025)

Cadre Holdings' (CDRE) quarterly Work In Process came in at $10.0 million in Q4 2025, up 20.26% YoY from $8.3 million in Q4 2024, and down 40.14% on a QoQ basis from $16.7 million in Q3 2025.

Cadre Holdings (CDRE) Work In Process (2020 - 2025) Analysis & Trends

Cadre Holdings (CDRE) has 6 years of Work In Process data on file, last reported at $10.0 million in Q4 2025.

  • Quarterly Work In Process rose 20.26% year-over-year to $10.0 million in Q4 2025, while the trailing twelve-month figure through Dec 2025 was $10.0 million (up 20.26% YoY) and the FY2025 annual result came in at $10.0 million, up 20.26% from the prior year.
  • Work In Process declined to $10.0 million in Q4 2025, from $16.7 million in the prior quarter.
  • In the past five years, Work In Process ranged from a high of $16.7 million in Q3 2025 to a low of $4.1 million in Q4 2021.
  • A 5-year average of $9.3 million and a median of $9.0 million in 2024 frame the typical range for Work In Process.
  • Annual changes were most pronounced in 2022 — Work In Process surged 85.0% — and 2024, when it declined 1.79%.
  • Tracing CDRE's Work In Process over 5 years: stood at $4.1 million in 2021, then surged by 84.21% to $7.5 million in 2022, then increased by 13.49% to $8.5 million in 2023, then declined by 1.79% to $8.3 million in 2024, then gained by 20.26% to $10.0 million in 2025.
  • The last three Work In Process figures came in at $10.0 million (Q4 2025), $16.7 million (Q3 2025), and $16.7 million (Q2 2025), per Business Quant data.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr)
1 General Electric 358.52 Bn 349.17 Bn 6.95 Bn
2 Rtx 287.21 Bn 278.91 Bn 9.91 Bn
3 Boeing 170.11 Bn 150.08 Bn 2.41 Bn
4 Lockheed Martin 131.49 Bn 127.70 Bn 2.45 Bn
5 Howmet Aerospace 109.12 Bn 108.56 Bn 951.00 Mn
6 General Dynamics 104.21 Bn 99.88 Bn 6.76 Bn
7 Northrop Grumman 80.06 Bn 77.76 Bn 3.72 Bn
8 TransDigm 67.85 Bn 65.08 Bn 1.63 Bn
9 L3Harris Technologies 50.31 Bn 48.79 Bn 1.50 Bn
10 Cadre Holdings 1.38 Bn 1.25 Bn -

Historic Data

Download Data
DateValue
Dec 31, 2025 10.01 Mn
Sep 30, 2025 16.72 Mn
Jun 30, 2025 16.68 Mn
Mar 31, 2025 9.90 Mn
Dec 31, 2024 8.32 Mn
Sep 30, 2024 9.24 Mn
Jun 30, 2024 9.43 Mn
Mar 31, 2024 8.99 Mn
Dec 31, 2023 8.47 Mn
Sep 30, 2023 9.00 Mn
Jun 30, 2023 9.15 Mn
Mar 31, 2023 8.75 Mn
Dec 31, 2022 7.47 Mn
Sep 30, 2022 8.94 Mn
Jun 30, 2022 8.88 Mn
Dec 31, 2021 4.05 Mn
Sep 30, 2021 4.83 Mn
Dec 31, 2020 3.74 Mn