Growth Metrics

Cracker Barrel Old Country Store (CBRL) Construction in Progress (2016 - 2025)

Cracker Barrel Old Country Store has reported Construction in Progress over the past 16 years, most recently at $22.0 million for Q3 2025.

  • Quarterly results put Construction in Progress at $22.0 million for Q3 2025, up 40.23% from a year ago — trailing twelve months through Aug 2025 was $22.0 million (up 40.23% YoY), and the annual figure for FY2025 was $22.0 million, up 40.23%.
  • Construction in Progress for Q3 2025 was $22.0 million at Cracker Barrel Old Country Store, up from $15.7 million in the prior quarter.
  • Over the last five years, Construction in Progress for CBRL hit a ceiling of $27.0 million in Q3 2023 and a floor of $13.8 million in Q3 2021.
  • Median Construction in Progress over the past 5 years was $22.0 million (2025), compared with a mean of $20.2 million.
  • Biggest five-year swings in Construction in Progress: surged 62.81% in 2022 and later crashed 41.77% in 2024.
  • Cracker Barrel Old Country Store's Construction in Progress stood at $13.8 million in 2021, then surged by 62.81% to $22.4 million in 2022, then increased by 20.42% to $27.0 million in 2023, then crashed by 41.77% to $15.7 million in 2024, then surged by 40.23% to $22.0 million in 2025.
  • The last three reported values for Construction in Progress were $22.0 million (Q3 2025), $15.7 million (Q3 2024), and $27.0 million (Q3 2023) per Business Quant data.