Growth Metrics

CBAK Energy Technology (CBAT) Construction in Progress (2017 - 2025)

CBAK Energy Technology's Construction in Progress history spans 9 years, with the latest figure at $89.5 million for Q3 2025.

  • For Q3 2025, Construction in Progress rose 129.42% year-over-year to $89.5 million; the TTM value through Sep 2025 reached $89.5 million, up 129.42%, while the annual FY2024 figure was $42.5 million, 12.51% up from the prior year.
  • Construction in Progress for Q3 2025 was $89.5 million at CBAK Energy Technology, up from $71.6 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $89.5 million in Q3 2025 and bottomed at $10.0 million in Q4 2022.
  • The 5-year median for Construction in Progress is $34.9 million (2021), against an average of $37.3 million.
  • The largest annual shift saw Construction in Progress tumbled 67.84% in 2022 before it skyrocketed 279.72% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $27.3 million in 2021, then tumbled by 63.6% to $10.0 million in 2022, then surged by 279.72% to $37.8 million in 2023, then grew by 12.51% to $42.5 million in 2024, then surged by 110.36% to $89.5 million in 2025.
  • Per Business Quant, the three most recent readings for CBAT's Construction in Progress are $89.5 million (Q3 2025), $71.6 million (Q2 2025), and $51.5 million (Q1 2025).