CBAK Energy Technology (CBAT) Construction in Progress (2017 - 2025)

CBAK Energy Technology (CBAT) has disclosed Construction in Progress for 9 consecutive years, with $32.0 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 24.64% to $32.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $32.0 million through Dec 2025, down 24.64% year-over-year, with the annual reading at $32.0 million for FY2025, 24.64% down from the prior year.
  • Construction in Progress hit $32.0 million in Q4 2025 for CBAK Energy Technology, down from $89.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $89.5 million in Q3 2025 to a low of $10.0 million in Q4 2022.
  • Historically, Construction in Progress has averaged $37.0 million across 5 years, with a median of $34.1 million in 2021.
  • Biggest five-year swings in Construction in Progress: crashed 67.84% in 2022 and later surged 279.72% in 2023.
  • Year by year, Construction in Progress stood at $27.3 million in 2021, then crashed by 63.6% to $10.0 million in 2022, then soared by 279.72% to $37.8 million in 2023, then increased by 12.51% to $42.5 million in 2024, then fell by 24.64% to $32.0 million in 2025.
  • Business Quant data shows Construction in Progress for CBAT at $32.0 million in Q4 2025, $89.5 million in Q3 2025, and $71.6 million in Q2 2025.