Cash Flow Statement
Growth Metrics

CrossAmerica Partners (CAPL) Construction in Progress (2016 - 2018)

CrossAmerica Partners filings provide 7 years of Construction in Progress readings, the most recent being $4.4 million for Q2 2018.

  • On a quarterly basis, Construction in Progress rose 9.17% to $4.4 million in Q2 2018 year-over-year; TTM through Jun 2018 was $4.4 million, a 9.17% increase, with the full-year FY2017 number at $1.8 million, down 43.37% from a year prior.
  • Construction in Progress hit $4.4 million in Q2 2018 for CrossAmerica Partners, up from $2.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4.9 million in Q4 2014 to a low of $1.8 million in Q4 2017.
  • Median Construction in Progress over the past 5 years was $3.4 million (2016), compared with a mean of $3.3 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 115.71% in 2014 and later plummeted 43.37% in 2017.
  • CrossAmerica Partners' Construction in Progress stood at $4.9 million in 2014, then fell by 24.77% to $3.7 million in 2015, then dropped by 13.45% to $3.2 million in 2016, then plummeted by 43.37% to $1.8 million in 2017, then skyrocketed by 145.24% to $4.4 million in 2018.
  • The last three reported values for Construction in Progress were $4.4 million (Q2 2018), $2.3 million (Q1 2018), and $1.8 million (Q4 2017) per Business Quant data.