British American Tobacco p.l.c (BTAFF) has 4 years of Construction in Progress data on file, last reported at $94.0 million in Q4 2016.
- Quarterly Construction in Progress fell 14.55% year-over-year to $94.0 million in Q4 2016, while the trailing twelve-month figure through Dec 2016 was $94.0 million (down 14.55% YoY) and the FY2016 annual result came in at $94.0 million, down 14.55% from the prior year.
- Construction in Progress declined to $94.0 million in Q4 2016, from $110.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $110.0 million in Q4 2014 to a low of $83.0 million in Q4 2013.
- A 4-year average of $99.2 million and a median of $102.0 million in 2014 frame the typical range for Construction in Progress.
- Annual changes were most pronounced in 2014 — Construction in Progress surged 32.53% — and 2016, when it dropped 14.55%.
- Tracing BTAFF's Construction in Progress over 4 years: stood at $83.0 million in 2013, then jumped by 32.53% to $110.0 million in 2014, then changed by 0.0% to $110.0 million in 2015, then retreated by 14.55% to $94.0 million in 2016.
- The last three Construction in Progress figures came in at $94.0 million (Q4 2016), $110.0 million (Q4 2015), and $110.0 million (Q4 2014), per Business Quant data.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2016 | 94.00 Mn |
| Dec 31, 2015 | 110.00 Mn |
| Dec 31, 2014 | 110.00 Mn |
| Dec 31, 2013 | 83.00 Mn |