Brenmiller Energy (BNRG) Construction in Progress (2022)

Brenmiller Energy's Construction in Progress history spans 1 years, with the latest figure at $685000.0 for Q4 2022.

  • For Q4 2022, Construction in Progress changed N/A year-over-year to $685000.0; the TTM value through Dec 2022 reached $685000.0, changed N/A, while the annual FY2022 figure was $685000.0, N/A changed from the prior year.
  • Construction in Progress for Q4 2022 was $685000.0 at Brenmiller Energy.
  • Across five years, Construction in Progress topped out at $685000.0 in Q4 2022 and bottomed at $685000.0 in Q4 2022.