Brenmiller Energy (BNRG) Construction in Progress (2022)

Brenmiller Energy's (BNRG) quarterly Construction in Progress came in at $685000.0 in Q4 2022.

Brenmiller Energy (BNRG) Construction in Progress (2022) Analysis & Trends

Brenmiller Energy has disclosed Construction in Progress across 1 years of filings, most recently posting $685000.0 for Q4 2022.

  • Construction in Progress for Q4 2022 came in at $685000.0, changed N/A year-over-year; the trailing twelve-month figure through Dec 2022 was $685000.0 (changed N/A YoY), and the FY2022 annual result was $685000.0, changed N/A from the prior year.
  • Construction in Progress came in at $685000.0 for Q4 2022 at Brenmiller Energy.
  • In the past five years, Construction in Progress ranged from a high of $685000.0 in Q4 2022 to a low of $685000.0 in Q4 2022.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 AXIA Energia 186.46 Bn 183.75 Bn 1.44 Bn -
2 Enlight Renewable Energy 11.26 Bn 10.73 Bn 85.64 Mn -
3 Ormat Technologies 8.50 Bn 8.35 Bn 78.83 Mn 1.05 Bn
4 Fluence Energy 3.04 Bn 2.71 Bn 46.63 Mn -
5 Clearway Energy 1.39 Bn 4.74 Bn 220.00 Mn -
6 XPLR Infrastructure 1.09 Bn 8.62 Bn 141.00 Mn -
7 Energy Vault Holdings 940.11 Mn 894.68 Mn 4.79 Mn -
8 Ellomay Capital 694.29 Mn 616.52 Mn 1,508.00 -
9 ReNew Energy Global 317.68 Mn 100.91 Mn 275.78 Mn -
10 Brenmiller Energy 527,341.66 -4.42 Mn - -

Historic Data

Download Data
DateValue
Dec 31, 2022 685,000.00