Growth Metrics

Bridger Aerospace Group Holdings (BAER) Construction in Progress (2022 - 2023)

Bridger Aerospace Group Holdings (BAER) has disclosed Construction in Progress for 2 consecutive years, with $15.2 million as the latest value for Q1 2023.

  • On a quarterly basis, Construction in Progress changed N/A to $15.2 million in Q1 2023 year-over-year; TTM through Mar 2023 was $15.2 million, a N/A change, with the full-year FY2022 number at $13.8 million, changed N/A from a year prior.
  • Construction in Progress was $15.2 million for Q1 2023 at Bridger Aerospace Group Holdings, up from $13.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $15.2 million in Q1 2023 to a low of $13.8 million in Q4 2022.