Growth Metrics

Bridger Aerospace Group Holdings (BAER) Construction in Progress (2022 - 2023)

Bridger Aerospace Group Holdings (BAER) has disclosed Construction in Progress for 2 consecutive years, with $15.2 million as the latest value for Q1 2023.

  • Quarterly Construction in Progress changed N/A to $15.2 million in Q1 2023 from the year-ago period, while the trailing twelve-month figure was $15.2 million through Mar 2023, changed N/A year-over-year, with the annual reading at $13.8 million for FY2022, N/A changed from the prior year.
  • Construction in Progress for Q1 2023 was $15.2 million at Bridger Aerospace Group Holdings, up from $13.8 million in the prior quarter.
  • The five-year high for Construction in Progress was $15.2 million in Q1 2023, with the low at $13.8 million in Q4 2022.